{"id":2114,"date":"2024-09-03T12:54:41","date_gmt":"2024-09-03T05:54:41","guid":{"rendered":"https:\/\/italthaiengineering.com\/projects\/combined-cycle-co-generation-of-b-grimm-power-phase-2-th\/"},"modified":"2026-11-17T16:19:16","modified_gmt":"2026-11-17T09:19:16","slug":"combined-cycle-co-generation-of-b-grimm-power-phase-2-th","status":"publish","type":"project","link":"https:\/\/italthaiengineering.com\/th\/projects\/combined-cycle-co-generation-of-b-grimm-power-phase-2-th\/","title":{"rendered":"Combined Cycle Co-Generation of B.Grimm Power (Phase 2)"},"content":{"rendered":"<p>Construction of Steam Distribution System, Condensate Water and Pipe Rack \/ Pipe Sleeper<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction of Steam Distribution System, Condensate W [&hellip;]<\/p>\n","protected":false},"featured_media":2112,"menu_order":0,"template":"","meta":{"_acf_changed":false,"footnotes":""},"project_category":[162],"project_tag":[],"class_list":["post-2114","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-utilities-work-th"],"acf":{"project_hero_image":null,"project_hero_image_mobile":null,"project_hero_text":"","project_subheading":"","project_capacity":"","project_system":"","project_related_eyebrow":"","project_related_heading":"","project_related":null,"project_related_link":"","project_client":"","project_location":"","project_year":"","project_status":"completed","project_value":"","project_scope":null,"project_gallery":[2112]},"_links":{"self":[{"href":"https:\/\/italthaiengineering.com\/th\/wp-json\/wp\/v2\/projects\/2114","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/italthaiengineering.com\/th\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/italthaiengineering.com\/th\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":1,"href":"https:\/\/italthaiengineering.com\/th\/wp-json\/wp\/v2\/projects\/2114\/revisions"}],"predecessor-version":[{"id":2776,"href":"https:\/\/italthaiengineering.com\/th\/wp-json\/wp\/v2\/projects\/2114\/revisions\/2776"}],"acf:attachment":[{"embeddable":true,"href":"https:\/\/italthaiengineering.com\/th\/wp-json\/wp\/v2\/media\/2112"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/italthaiengineering.com\/th\/wp-json\/wp\/v2\/media\/2112"}],"wp:attachment":[{"href":"https:\/\/italthaiengineering.com\/th\/wp-json\/wp\/v2\/media?parent=2114"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/italthaiengineering.com\/th\/wp-json\/wp\/v2\/project_category?post=2114"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/italthaiengineering.com\/th\/wp-json\/wp\/v2\/project_tag?post=2114"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}