Suvarnabhumi Airport, Samutprakarn – 4.4 MWp

Located in Samut Prakan, Suvarnabhumi Airport is one of Thailand’s most important aviation hubs, requiring reliable and efficient energy infrastructure to support its operations.

We delivered a 4.4 MWp solar power project at Suvarnabhumi Airport, providing an integrated renewable energy solution designed to support the airport’s energy requirements while contributing to its sustainability objectives.

As the project’s manufacturer and construction partner, we were responsible for the production, construction, and installation of the solar power system. Our end-to-end approach enabled us to maintain quality and efficiency throughout every stage of the project, from manufacturing and preparation through to on-site installation and completion.

The completed 4.4 MWp system generates clean, renewable electricity and helps reduce dependence on conventional energy sources and associated carbon emissions. The project reflects our capability to deliver large-scale solar installations in complex and high-demand environments, combining engineering expertise, manufacturing capabilities, and on-site construction experience.

Sahapat Solar Rooftop and Solar Floating – 25 MWp

Sahapat Group set out to supply its factories with clean electricity generated on its own land and roofs.

We delivered 25 MWp of combined rooftop and floating solar capacity across several sites, designing each array around the roof structures, ponds and grid connections available at each factory.

Floating arrays were anchored and cabled for seasonal water-level changes, and every installation was integrated with the sites’ existing electrical systems. The project lowers energy costs for the group and cuts its carbon emissions year after year.

Orange Line Subway

The MRT Orange Line will connect eastern and western Bangkok underground, carrying hundreds of thousands of passengers a day.

We delivered utility works for underground stations and tunnels, including power distribution, lighting and the passenger signage system.

Working in confined underground spaces alongside other contractors, we coordinated closely on sequencing and safety to keep the wider programme on track.

Pak Phanang Wind Farm – 10 MW (Net)

Pak Phanang’s coastline offers steady winds that make it one of the region’s best sites for wind energy.

We delivered the balance-of-plant and electrical works for a 10 MW (net) wind farm, from turbine foundations and collection cabling to the substation and grid connection.

The farm now feeds clean electricity into the regional grid, supporting Thailand’s renewable energy targets.

SOLARCO – 39.4 MWp with 115 kV Substation

SOLARCO developed a utility-scale solar farm to supply clean power directly to the national grid.

We delivered 39.4 MWp of ground-mounted solar together with a 115 kV substation and transmission connection, under a single EPC contract.

From yield studies to grid synchronisation, our teams managed every stage, delivering a plant that has performed to its design output since commissioning.